Timeline for Improvements
This study will continue through 2025, and recommendations will still require design and implementation time beyond the study’s completion. The following timeline reflects the study efforts and points in time where BFT will be sharing corridorA broad geographical band that follows a general directional flow connecting major sources of trips that may contain a number of streets, highways and transit route alignments. More improvement concepts with the public:
